A successful roof installation requires precision, planning, and adherence to proven building standards. Here’s what our roof installation process includes from start to finish:
Site Evaluation
Material Selection
Deck Preparation
Underlayment Installation
Roofing System Installation
Final Cleanup & Inspection
Roof installation is essential for both new construction and property upgrades. Here are the most common projects we complete for our clients:
New roofs for custom-built single-family homes and additions
Full roof installation during major residential renovations or remodels
Replacing roofs on aging or storm-damaged properties
Roof installations for detached garages and accessory buildings
Roofing systems for multi-family housing and duplexes
Flat roof installations for porches, patios, or low-slope structures
Roof upgrades to meet new code or insurance requirements
A properly installed roof protects your home for decades. Our step-by-step installation process ensures quality, safety, and code compliance at every stage.
We assess your roof’s structure, slope, and layout to plan the installation approach, materials, and timeline.
Old roofing materials are removed, and we inspect the decking for damage or rot, replacing any weak sections.
We install water-resistant underlayment, ice and water barriers, and flashing in valleys and around penetrations.
Shingles, tiles, or panels are installed using precise fastening techniques and aligned to manufacturer specifications.
Proper ventilation systems are added or improved, and ridge caps are installed to seal the roof’s peak.
We clear all debris, perform a full quality check, and ensure everything meets code and manufacturer standards.
No, you don’t need to be present, but it's helpful to be reachable by phone in case questions or approvals arise during installation.
Clear the driveway, move patio furniture, secure valuables inside, and remove wall decor due to vibrations. Trim overhanging branches if possible.
Roofing should only be installed during dry conditions. Cold or wet weather can interfere with adhesive bonding and material performance.
Not always. In some cases, a new layer can be added, but tear-off is recommended to inspect the decking and meet code requirements.
Most residential roof installations take 1 to 3 days depending on size, slope, material, and weather conditions.
CONTACT US
Ready for a new roof installed with precision and built to last? Our team handles everything from planning to final inspection with expert care. Call (407) 780-2635 to book your roof installation consultation and get started today.
LICENSE NUMBER CCC1332144
© 2025 All Rights Reserved | Mega Roofing